South End of Chongde Tunnel

Attractions along Suhua Historic Trail

The Chongde Tunnel was opened to traffic on August 10, 1990, with a total length of about 325 meters. The Shigangzai section of Suhua Historic Trail still remains above the tunnel and can be reached from the south end of Chongde Tunnel.  In 2012, it was attacked by moderate typhoon Sula, and the area for car parking at the south end of the tunnel was washed away due to heavy rain.

 The Shigangzai section of the Suhua Historic Trai belongs to the Taroko National Park and is temporarily closed, and due to the rapid climate change in recent years, the Taroko National Park Headquarters has no restoration plan. This trail is one of the coastal Lifan roads excavated in the 3rd year of Taisho (1914). Today, there are still complete stone steps along the way, where you can overlook the Qingshui cliff.

  • - / -
  • - - -
  • -
  • - -/-
  • -
This image was taken in 2011 at the south end of Chongde Tunnel, 176 kilometers of Suhua Highway.
This image was taken in 2011 at the south end of Chongde Tunnel, 176 kilometers of Suhua Highway.
This image was taken in 2011 at the south end of Chongde Tunnel, 176 kilometers of Suhua Highway.
古道地圖
沿途景點所在位置
沿途景點所在縣市
花蓮縣
沿途景點所在鄉鎮
秀林鄉